< Back | |
22 Dec 2014 | |
Tata Power Company Ltd has informed BSE that a technical snag developed in Unit No.7 at Trombay Thermal Power Generating Station. The gas turbine generator rotor of the Combined Cycle Gas based unit developed an inter-turn short and ground. However, there is no associated damage to any other equipment.<BR><BR>The exact extent of the fault / repair and schedule required would be known once the rotor end rings are dismantled and fault / damage is closely examined. | |
View all announcements for TATA POWER CO.LTD. | Source: BSE India |