Chenab River Diversion for Ratle Hydroelectric Project

By By Rediff Money Desk, NEWDELHI
Jan 29, 2024 15:16
India's government has diverted the Chenab river water to expedite construction of the 850 MW Ratle Hydroelectric Project in Jammu & Kashmir.
New Delhi, Jan 29 (PTI) The government on Monday announced diversion of Chenab river water through diversion tunnels at Drabshalla in Kishtwar district to expedite the 850-MW Ratle Hydro Electric Project in Jammu & Kashmir.

"A major milestone has been achieved at the 850 MW Ratle Hydro Electric Project in Jammu & Kashmir with the diversion of Chenab river through diversion tunnels at Drabshalla in Kishtwar district, at 11.30 AM on January 27, 2024," the power ministry said in a statement.

The diversion of river flow will enable isolation of dam area, paving way for the excavation and construction works, it said.

The move will expedite construction activities and help in minimising delays so as to facilitate all efforts to meet the scheduled commissioning deadline of May 2026, the ministry said.

Ratle Project is being executed by Ratle Hydroelectric Power Corporation Limited (RHPCL), a joint venture of NHPC Limited and the government of J&K, with shareholding of 51:49 per cent, respectively.

Ratle HE project is situated on the Chenab river in Kishtwar district of J&K with an installed capacity of 850 MW. The Cabinet Committee on Economic Affairs sanctioned the project in January 2021 at the cost of Rs 5,281.94 crore.
Read More On:
ratle hydroelectric projectchenab riverjammu & kashmirhydroelectric powerindia
DISCLAIMER - This article is from a syndicated feed. The original source is responsible for accuracy, views & content ownership. Views expressed may not reflect those of rediff.com India Limited.

You May Like To Read

MORE NEWS

DRI Seizes Red Sanders Worth Rs 6.26 Cr, 4...

DRI seizes 15 MT of red sanders worth Rs 6.26 crore in Delhi, arrests 4. Illegal export...

UAE Fund to Invest ₹1,000 Cr in Kerala Startups

UAE-based Feeder Fund to invest ₹1,000 crore in Kerala startups over 3 years. Boost...

ECL Aims for 58 MT Output, Mine Closures Planned

Eastern Coalfields Ltd (ECL) targets 58 MT output, plans closure of six underground...

India: Export Potential in Russia

300 Indian products have huge export potential in Russia. Engineering, pharma, agri,...

Gold & Silver Rally: Inflation Data in Focus

Gold and silver prices rally amid inflation data focus. Analysts eye central bank...

India Ranks 3rd in Global AI Vibrancy Index

India ranks 3rd in Stanford University's Global AI Vibrancy tool, surpassing advanced...

EPFOA Urges CPFC: Equip Offices for Compliance

EPFOA urges CPFC to equip field offices with authority & tools to handle default &...

TV Prices to Rise in January: Chip Shortage &...

TV prices are expected to increase in January due to memory chip shortages and a...

India Gems & Jewellery Exports Up 20% in November

India's gems and jewellery exports grew 20% to USD 2.5 billion in November, says GJEPC....

Navi Mumbai Airport: 3rd Runway Feasibility Study

CIDCO invites bids for a consultant to study the feasibility of a third runway at Navi...

Read More »

Sectoral Indices Market Indicators Listed Companies Gainers Losers Mutual Funds Portfolio Watchlist
© 2025 Rediff.com