ACME Commissions 100MW Wind Power Project Phase 2
x
ACME Eco Clean Energy commissions the 16 MW second phase of its 100-MW wind power project in Gujarat. Total commissioned capacity reaches 44 MW.

New Delhi, Nov 19 (PTI) ACME Eco Clean Energy, a subsidiary of ACME Solar Holdings, has commissioned the 16 MW second phase of its 100-MW wind power project in Gujarat.
With the development, ACME Eco Clean Energy has achieved a commissioned capacity of 44 MW of the 100 MW project located at Titoda village in Sayla district of the state.
Gurugram-based ACME Solar is a leading integrated renewable energy player with a diversified portfolio spanning solar, wind, storage, FDRE (firm and dispatchable renewable energy) and hybrid solutions.
With the development, ACME Eco Clean Energy has achieved a commissioned capacity of 44 MW of the 100 MW project located at Titoda village in Sayla district of the state.
Gurugram-based ACME Solar is a leading integrated renewable energy player with a diversified portfolio spanning solar, wind, storage, FDRE (firm and dispatchable renewable energy) and hybrid solutions.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- Vodafone-Idea-L
- 10.76 (+ 0.75)
- 51694073
- Sattva-Sukun-Lifecar
- 0.56 (+ 5.66)
- 34065315
- Pradhin
- 0.27 (+ 17.39)
- 31625938
- Alstone-Textiles
- 0.30 ( 0.00)
- 31207490
- Sunshine-Capital
- 0.25 ( -3.85)
- 27486481





