Hi-Tech Pipes Aims for 13.5 MW Solar Capacity
By Rediff Money Desk, New Delhi Jul 24, 2024 14:48
Hi-Tech Pipes plans to increase its renewable energy capacity to 13.5 MW by December 2024, aiming for 30% of its power needs from green sources. The company is also exploring green hydrogen projects.

New Delhi, Jul 24 (PTI) Steel pipes maker Hi-Tech Pipes on Wednesday said the company aims to have 13.5 MW of renewable energy capacity for captive usage by December 2024.
It has an installed solar power capacity of 8.5 MW and is in the process of installing another 5 MW in a phased manner, the company said in a regulatory filing.
The company did not disclose any financial details. However, as per industry estimates 1 MW of solar involves around Rs 5-7 crore of investment, including land cost.
"With all the above steps company's green power sourcing will be around 13.50 MW, which will contribute around 30 per cent of the total power requirement of the company," the filing said.
Further, Hi-Tech Pipes said it has "executed an MoU with a leading renewable energy supplier for generation and captive use of green hydrogen projects in a time-bound manner. The supplier will bring its strong EPC credentials to the table with deep R&D capabilities in many aspects of green hydrogen."
Hi-Tech Pipes owns and operates six integrated manufacturing facilities located at Sikandrabad (Uttar Pradesh), Sanand (Gujarat), Hindupur (Andhra Pradesh) - near Bengaluru and Khopoli (Maharashtra) having installed capacity of 7,50,000 metric tonnes per annum.
Besides steel pipes, the company produces hollow sections, tubes, cold rolled coils and strips, road crash barriers, solar mounting structures and a variety of other galvanised products.
It has an installed solar power capacity of 8.5 MW and is in the process of installing another 5 MW in a phased manner, the company said in a regulatory filing.
The company did not disclose any financial details. However, as per industry estimates 1 MW of solar involves around Rs 5-7 crore of investment, including land cost.
"With all the above steps company's green power sourcing will be around 13.50 MW, which will contribute around 30 per cent of the total power requirement of the company," the filing said.
Further, Hi-Tech Pipes said it has "executed an MoU with a leading renewable energy supplier for generation and captive use of green hydrogen projects in a time-bound manner. The supplier will bring its strong EPC credentials to the table with deep R&D capabilities in many aspects of green hydrogen."
Hi-Tech Pipes owns and operates six integrated manufacturing facilities located at Sikandrabad (Uttar Pradesh), Sanand (Gujarat), Hindupur (Andhra Pradesh) - near Bengaluru and Khopoli (Maharashtra) having installed capacity of 7,50,000 metric tonnes per annum.
Besides steel pipes, the company produces hollow sections, tubes, cold rolled coils and strips, road crash barriers, solar mounting structures and a variety of other galvanised products.
Source: PTI
DISCLAIMER - This article is from a syndicated feed. The original source is responsible for accuracy, views & content ownership. Views expressed may not reflect those of rediff.com India Limited.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- Vodafone Idea L
- 8.82 ( -3.29)
- 32307632
- Quadrant Televenture
- 0.50 ( -3.85)
- 22650423
- Srestha Finvest
- 0.66 (+ 1.54)
- 16236668
- Murae Organisor
- 1.94 (+ 4.86)
- 14718049
- Spright Agro
- 7.37 (+ 4.99)
- 14440430
MORE NEWS

Ajax Engineering IPO Subscribed 49% on Day 2
Ajax Engineering's IPO received 49% subscription on Day 2, with strong demand from...

Solar Park Development Challenges: Land...
Union Minister Shripad Naik highlights the challenge of land acquisition for solar park...
GoMechanic Invests Rs 100 Cr in Two-Wheeler...
GoMechanic plans to set up 1,000 two-wheeler service stations across India with Rs 100...