JSW Neo Energy Wins 200 MW Wind-Solar Hybrid Project
By Rediff Money Desk, New Delhi Aug 27, 2024 11:37
JSW Neo Energy secures a 200 MW wind-solar hybrid project in Maharashtra, boosting its total locked-in generation capacity to 17.2 GW. The company aims for 20 GW generation capacity and 40 GWh energy storage by 2030.
New Delhi, Aug 27 (PTI) JSW Energy on Tuesday said its arm JSW Neo Energy has received a letter of award (LoA) for setting up a wind-solar hybrid power project from Maharashtra State Electricity Distribution Company (MSEDCL).
The 200 MW wind-solar hybrid power project was awarded to JSW Neo Energy in a tariff-based competitive bid, a JSW Energy statement said.
As a result of this capacity award, the company's total locked-in generation capacity has increased to 17.2 GW, which includes a total locked-in hybrid capacity of 2.9 GW (including FDRE), the statement said.
JSW Energy has a total locked-in generation capacity of 17.2 GW comprising 7.5 GW operational, 2.3 GW under construction across wind, thermal and hydro and RE pipeline of 7.3 GW (PPAs signed for 2.3 GW).
The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently.
The company also has 4.2 GWh of locked-in energy storage capacity through battery energy storage systems and hydro-pumped storage projects.
The company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030.
JSW Energy has set an ambitious target of achieving carbon neutrality by 2050.
The 200 MW wind-solar hybrid power project was awarded to JSW Neo Energy in a tariff-based competitive bid, a JSW Energy statement said.
As a result of this capacity award, the company's total locked-in generation capacity has increased to 17.2 GW, which includes a total locked-in hybrid capacity of 2.9 GW (including FDRE), the statement said.
JSW Energy has a total locked-in generation capacity of 17.2 GW comprising 7.5 GW operational, 2.3 GW under construction across wind, thermal and hydro and RE pipeline of 7.3 GW (PPAs signed for 2.3 GW).
The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently.
The company also has 4.2 GWh of locked-in energy storage capacity through battery energy storage systems and hydro-pumped storage projects.
The company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030.
JSW Energy has set an ambitious target of achieving carbon neutrality by 2050.
Source: PTI
DISCLAIMER - This article is from a syndicated feed. The original source is responsible for accuracy, views & content ownership. Views expressed may not reflect those of rediff.com India Limited.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- Vodafone Idea L
- 9.17 ( -6.43)
- 158804255
- G V Films
- 0.92 ( -2.13)
- 92620172
- Srestha Finvest
- 0.93 (+ 4.49)
- 40021818
- GTL Infrastructure
- 2.21 ( -4.74)
- 33334323
- Spicejet Ltd.
- 57.56 ( -8.33)
- 31426149
MORE NEWS
Augustinus Bader Skincare & Haircare Launches...
Tira brings Augustinus Bader's luxury skincare and haircare to India, offering...
Muthoot Finance Gold Loans Now Available on...
Muthoot Finance announces that its flagship gold loans can now be availed using Google...
NCERT Books Now Available on Amazon India
NCERT textbooks for students from Kindergarten to Class 12 and UPSC aspirants are now...