Waaree Renewable Wins 40 MWh Battery Storage Project in Gujarat
Waaree Renewable Technologies secures a 40 MWh battery storage contract from Continuum Green Energy for wind-solar hybrid sites in Gujarat. The project is valued at Rs 40 crore and will utilize lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS)...
New Delhi, Feb 13 (PTI) Waaree Renewable Technologies on Thursday said it has secured a 40 MWh battery storage contract from Continuum Green Energy.
The project will be located at wind-solar hybrid sites in Gujarat, Waaree Renewable Technologies said in a statement.
The contract is valued at Rs 40 crore, it said.
The technology for these projects will utilise lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS) solution.
This project will be executed on an engineering, procurement and construction (EPC) basis.
The project will be located at wind-solar hybrid sites in Gujarat, Waaree Renewable Technologies said in a statement.
The contract is valued at Rs 40 crore, it said.
The technology for these projects will utilise lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS) solution.
This project will be executed on an engineering, procurement and construction (EPC) basis.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- GMR-Airports
- 112.50 (+ 0.58)
- 41108049
- PC-Jeweller
- 10.00 (+ 1.83)
- 18911456
- Vodafone-Idea
- 14.20 (+ 1.14)
- 16971663
- Sylph-Industries
- 0.27 ( -3.57)
- 13515423
- Standard-Cap-Mkt
- 0.43 (+ 2.38)
- 12337934





