Waaree Renewable Wins 40 MWh Battery Storage Project in Gujarat
Waaree Renewable Technologies secures a 40 MWh battery storage contract from Continuum Green Energy for wind-solar hybrid sites in Gujarat. The project is valued at Rs 40 crore and will utilize lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS)...
New Delhi, Feb 13 (PTI) Waaree Renewable Technologies on Thursday said it has secured a 40 MWh battery storage contract from Continuum Green Energy.
The project will be located at wind-solar hybrid sites in Gujarat, Waaree Renewable Technologies said in a statement.
The contract is valued at Rs 40 crore, it said.
The technology for these projects will utilise lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS) solution.
This project will be executed on an engineering, procurement and construction (EPC) basis.
The project will be located at wind-solar hybrid sites in Gujarat, Waaree Renewable Technologies said in a statement.
The contract is valued at Rs 40 crore, it said.
The technology for these projects will utilise lithium iron phosphate (LFP) based liquid-cooled containerised battery energy storage system (BESS) solution.
This project will be executed on an engineering, procurement and construction (EPC) basis.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- Vodafone-Idea-L
- 11.36 ( -2.49)
- 94664837
- AvanceTechnologies
- 1.16 (+ 4.50)
- 34522155
- Sunshine-Capital
- 0.26 ( -3.70)
- 29015901
- Alstone-Textiles
- 0.27 ( -3.57)
- 28695959
- Mehai-Technology
- 1.65 ( -4.62)
- 28262795






