NHPC Starts 600 MW Power Supply from Parbati-II Hydro Project
x
NHPC has begun commercial supply of 600 MW electricity from three units of the Parbati-II hydro project in Himachal Pradesh, with the remaining unit expected to start soon.
New Delhi, Mar 31 (PTI) State-owned NHPC on Monday announced starting commercial supply of 600 MW of electricity from three units of Parbati-II hydro project in Himachal Pradesh from April 1.
Parbati-II hydro project has four units of 200MW each and the trial run and COD (commercial date of operation) of balance Unit-4 (of 200 MW) will be intimated in due course, a regulatory filing stated.
According to the filing, after successful completion of trial runs, NHPC declared commercial operation of Unit-1, Unit-2 & Unit-3 (of 200 MW each) of Parbati-II hydro project (4x200 MW), Himachal Pradesh from 00:00 hours on April 1, 2025.
The Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati, as per the information available on NHPC's official web portal.
The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.52 Km long Head Race Tunnel and the Power House shall be located at village Suind in Sainj valley.
Parbati-II hydro project has four units of 200MW each and the trial run and COD (commercial date of operation) of balance Unit-4 (of 200 MW) will be intimated in due course, a regulatory filing stated.
According to the filing, after successful completion of trial runs, NHPC declared commercial operation of Unit-1, Unit-2 & Unit-3 (of 200 MW each) of Parbati-II hydro project (4x200 MW), Himachal Pradesh from 00:00 hours on April 1, 2025.
The Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati, as per the information available on NHPC's official web portal.
The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.52 Km long Head Race Tunnel and the Power House shall be located at village Suind in Sainj valley.
You May Like To Read
TODAY'S MOST TRADED COMPANIES
- Company Name
- Price
- Volume
- Vodafone Idea L
- 7.31 (+ 0.55)
- 43007588
- Vikas Lifecare
- 2.59 ( -9.76)
- 16773326
- Sharanam Infra
- 0.61 (+ 3.39)
- 16031920
- GTL Infrastructure
- 1.50 (+ 0.67)
- 15104848
- G G Engineering
- 0.91 ( -4.21)
- 8814883